Três locomotivas a bateria de lítio de 3 toneladas com ...
Em outubro de 2026, a HNYT concluiu a embalagem e o carregamento de três locomotivas a bateria de lítio de 3 toneladas fabricadas sob medida para um cliente de mineração na África. Elas têm bitola ultraestreita igual à dos trilhos já instalados na mina do cliente, onde vão puxar vagonetas carregadas de minério e estéril pelas galerias subterrâneas. Motores de tração sobressalentes e uma caixa de peças de desgaste seguiram com o pedido.

Shipment at a Glance
| Item | Shipment information |
| Product | 3 ton lithium battery locomotive (custom order) |
| Quantity | 3 units, plus spare parts |
| Specification | Same as our 2.5 ton battery locomotive |
| Customer | Mining company in Africa (name and country not disclosed) |
| Application | Underground rail haulage of ore and waste rock |
| Battery | Lithium battery pack with battery management system |
| Track gauge | Custom ultra-narrow gauge, matched to the customer’s existing rails |
| Traction motor | 3.5 kW × 1 |
| Traction force | 2.55 kN rated / 6.13 kN maximum |
| Hauling capacity | 20–22 t on a 3‰ gradient |
| Safety mark | KA (mining product safety mark for non-coal mines) |
| Shipped with | Spare traction motors, gears, drive shafts and brake parts |
| Dispatch | October 2026, by truck from the HNYT factory |
Built Around the Customer’s Track
The customer’s mine runs on ultra-narrow track, sized for small drifts and light mine cars and narrower than the common gauges for this model. Re-laying the rails would be costly and would interrupt production, so we built the locomotives to the gauge the mine already uses.
Changing the gauge is more than moving the wheels. The wheelsets, axle length, frame width and brake rigging were reworked so the locomotive stays stable on the narrow track and still clears the drift walls. The result is a compact battery mining locomotive that couples to the customer’s existing mine cars, handles the tight curves of a small mine and can go to work without changes to the haulage system.
Why Lithium Instead of Lead-Acid
The platform is offered with either lead-acid or lithium batteries. For this underground mining locomotive the customer chose lithium, for reasons that matter in daily operation:
- Less maintenance.There is no electrolyte to top up and no acid to handle in the charging bay.
- Shorter charging time.The locomotive spends less time on charge between shifts and can be topped up during breaks without harming the battery.
- Longer cycle lifeunder the deep daily discharge typical of rail haulage.
- Built-in protection.The battery management system monitors cell voltage and temperature and prevents over-charge and over-discharge.
For a small mine that runs only a few locomotives, these points add up to more working hours per locomotive each day.
Packing and Loading
Each locomotive was wrapped in several layers of stretch film covering the cab, the controls and the battery compartment, to keep out dust and moisture on the long trip to Africa. The KA plates on the bodies show that the locomotives carry the safety mark for equipment used in non-coal mines.

The spare traction motors were packed with the order so the mine has replacements on site. Each motor carries its own KA nameplate, and the shaft ends were wrapped before shipment.

Spare gears, drive shafts and brake parts were bagged one by one and packed into a divided plywood crate, with the heavy gears kept apart from the shafts, then strapped shut.

Locomotives and crates were then loaded together onto the truck. Every crate carries a numbered HNYT label, so the customer can check each package against the packing list on arrival. Smaller cases were packed tightly around the locomotives to stop the load from shifting on the road.

Related Products and Information
- 5 ton battery locomotive – full specifications (same as this order)
- Mining battery powered locomotives – all models
- Earlier shipment: two custom 2.5 ton battery locomotives for an African gold mine
- Why our 2.5-ton battery locomotives are trusted by overseas customers
- Case: 12-ton lithium battery locomotive at a large iron mine
- HNYT certifications (MA / KA)
Need a Locomotive for Non-Standard Track?
Send us your track gauge, rail size, drift width and height, gradient, haulage distance and tonnage per shift, plus the number of locomotives you need. Our engineers will confirm the right configuration and reply with a quotation and the full specification sheet.

